Jian Guo An Zhu 31, ceramic tile back glue
+
  • Jian Guo An Zhu 31, ceramic tile back glue

Share

Jian Guo An Zhu 31, ceramic tile back glue

It is a single-component water-based product refined from modified polymer emulsion and various functional auxiliaries. It features high bonding strength, good brushing and fast drying, and strong anti-dropping brick effects. The product is suitable for the back treatment of tiles and can be used with tile adhesive to effectively reduce the phenomenon of tile hollowing and falling off.

Still deciding? If you are interested, you need to get a sample first,Contact us!

Tag

  • Product details
  • This is a single-component, water-based product refined from modified polymer emulsion and various functional auxiliaries. It features high bonding strength, easy brushing, fast drying, and strong anti-dropping properties. The product is suitable for back treatment of tiles and, when used with tile adhesive, effectively reduces the hollowing and falling off of tiles.

    Execution Standard

    《Building Coating Emulsion》 (GB/T 20623-2006)

    Product Features

    High-strength bonding, strong anti-dropping; immediate application, efficient and easy construction.

    Scope of Application

    Suitable for various specifications and sizes of tiles on indoor walls, such as ceramic tiles, polished tiles, and marble tiles, for back interface treatment.

    Construction Points

    1. Mix the tile back adhesive evenly.

    2. Brushing or rolling can be used. Use a brush or roller to evenly apply the mixed back adhesive to the back of the facing brick material. It is recommended to use the "cross method" to evenly apply a layer to avoid omissions.

    3. Allow to dry completely for more than 5 hours before proceeding to the next construction process.

    4. Reference usage: This product strictly prohibits adding water. Stir evenly after opening the bucket and use directly. 1kg can cover approximately 8㎡~10㎡.

    Precautions

    1. During construction and within one day after completion, the substrate and ambient temperature should be between 5~35℃. Avoid splashing water on the freshly applied material for one day.

    2. Do not add water or any other agents when mixing this product. The mixed material should be used up within the specified time; do not remix after exceeding the time limit.

    3. After construction, proper maintenance and protection should be carried out to prevent pollution, collision, and damage.

    4. If the product comes into contact with eyes, seek medical attention immediately.

    5. This product should be stored in a cool and dry environment, avoiding dampness and rain.

    6. Storage temperature 5~35℃, shelf life is approximately 6 months.

    Transportation and Storage

    During storage, the product should be kept in a ventilated and dry place, protected from direct sunlight. Appropriate anti-freezing measures should be taken in winter.

Product Inquiry

* Note: Please leave your contact information, our professionals will contact you as soon as possible!