Jian Guo An Zhu 54# General Purpose Water Stop
+
  • Jian Guo An Zhu 54# General Purpose Water Stop

Share

Jian Guo An Zhu 54# General Purpose Water Stop

It is a rapid-setting waterproof and leak-stopping material composed of special cement and various additives; it features fast setting speed, high strength, good impermeability, and good adhesion to the base surface; it is suitable for repairing cracks, grooves, and holes and can be used for moisture-proof, waterproof, and leak-stopping projects, and is also suitable for crack sealing and grouting nozzle fixing with chemical grouting.

Still deciding? If you are interested, you need to get a sample first,Contact us!

Tag

  • Product details
  • It is a rapid-setting waterproof and leak-stopping material composed of special cement and various additives; it features fast setting speed, high strength, good impermeability, and good adhesion to the base surface; it is suitable for repairing cracks, grooves, and holes and can be used for moisture-proof, waterproof, and leak-stopping projects, and is also suitable for crack sealing and grouting nozzle fixing in chemical grouting.
    Implementation Standard

    《Inorganic Waterproof and Leak-Stopping Material》(GB23440-2009)Type I

    Product Features

    High strength, good impermeability. Fast setting, improved efficiency. Construction can be carried out on both the facing and back surfaces, strong bonding force.

    Scope of Application

    ◆ Suitable for moisture-proof, waterproof, and leak-stopping projects in concrete buildings, structures, civil defense projects, subway tunnels, basements, kitchens, bathrooms, and balconies.

    ◆ Suitable for waterproof and leak-stopping repair projects of water and electricity conduits, leaking holes, wall holes, and cracks on the facing or back surface.

    ◆ Suitable for pre-treatment of base layer details such as Yin and Yang corners and pipe root rounding.

    ◆ Suitable for auxiliary projects such as crack sealing and rapid fixing of grouting nozzles in chemical grouting.

    Construction Points

    ◆ Clean the area to be treated. The base layer must be thoroughly wetted before construction, but there should be no standing water;

    ◆ During construction, first pour the weighed water into a clean mixing bucket, then pour in the leak-stopping material and stir quickly. This product sets quickly, so do not mix too much at once. It is recommended to mix in batches. The mixed leak-stopping material should be used quickly;

    ◆ When plugging leaks and repairing, use a powder-to-water ratio of 1: (0.25~0.3) and mix quickly and evenly before use;

    ◆ When applying to pipe roots and inner corners, use a powder-to-water ratio of 1: (0.3~0.4) and mix quickly and evenly before use;

    ◆ When applying to large surfaces, use a powder-to-water ratio of 1: (0.4~0.5) and mix quickly and evenly before use;

    ◆ For minor water seepage pits and holes, the dry powder product can be directly put into the pits and holes, compacted and smoothed, and then watered for curing.

    Precautions

    The setting time may fluctuate due to different water usage and construction temperatures; after opening, to avoid affecting product performance, unused product should be resealed; this product is highly alkaline, and appropriate protective measures should be taken during construction.

    Transportation and Storage

    ◆ The product is transported by general transportation methods. Protect from rain and damage to packaging during transportation. Strictly prevent moisture during storage.

    ◆ Under normal storage and transportation conditions, the product has a shelf life of 6 months from the date of production.

Product Inquiry

* Note: Please leave your contact information, our professionals will contact you as soon as possible!