WJG-100SBS/APP modified asphalt waterproof membrane series
+
  • WJG-100SBS/APP modified asphalt waterproof membrane series

Share

WJG-100SBS/APP modified asphalt waterproof membrane series

It is a rapid-setting waterproof and leak-stopping material composed of special cement and various additives; it features fast setting speed, high strength, good impermeability, and good adhesion to the base surface; it is suitable for repairing cracks, grooves, and holes and can be used for moisture-proof, waterproof, and leak-stopping projects, and is also suitable for crack sealing and grouting nozzle fixing with chemical grouting.

Still deciding? If you are interested, you need to get a sample first,Contact us!

  • Product details
  • It is a rapid-setting waterproof and leak-stopping material composed of special cement and various additives; it features fast setting speed, high strength, good impermeability, and good adhesion to the base surface; it is suitable for repairing cracks, grooves, and holes and can be used for moisture-proof, waterproof, and leak-stopping projects, and is also suitable for crack sealing and grouting nozzle fixing with chemical grouting.

    Execution Standard

    《Inorganic Waterproof and Leak-Stopping Material》(GB23440-2009) Type I

    Product Advantages

    ◆ Pre-laid types have the advantages of ordinary pre-laid products, and self-adhesive types have the advantages of ordinary self-adhesive products;

    ◆ The two types of rolls are factory-automated composite, with full adhesion between the two layers, realizing factory-based on-site construction;

    ◆ Compared with the traditional two-layer separate construction, one-time construction is possible, making construction convenient and saving time;

    ◆ Both the long and short sides use double-lap methods, making the lap more reliable and the waterproof effect better;

    ◆ One-time laying provides two layers of protection, resulting in higher cost-effectiveness;

    ◆ The silicon carbide protective layer has strong resistance to external damage, can withstand steel bar punctures, is not afraid of welding slag, and can effectively protect the waterproof membrane from damage during steel bar binding.

    Application Range

    Pre-laid products: Widely used in underground waterproofing projects, such as basement slabs, subways, corridors, and tunnels;

    Self-adhesive products: Widely used in roofs, basements, etc.

    Construction Methods

    Pre-laid bonding method or self-adhesive method

    Storage and Transportation

    ◆ When storing on-site, different types and specifications of products should be stored separately and should not be mixed.

    ◆ Avoid sun and rain, pay attention to ventilation, and keep away from fire sources.

    ◆ The storage temperature should not exceed 45℃. When the rolls are laid flat, the stacking height should not exceed five layers, and when laid vertically, they should be stacked in a single layer.

    ◆ When the on-site storage time is long, cover with tarpaulins or other shielding measures, and store directly in the warehouse if conditions permit.

    ◆ Determine the material storage location in advance to reduce secondary handling. During handling, handle with care to avoid material damage.

    ◆ The shelf life is at least 1 year from the date of production.

Product Inquiry

* Note: Please leave your contact information, our professionals will contact you as soon as possible!